What does a prefab ADU cost all in?

For an 800 sq. ft. ADU, HRG’s materials planning rate puts the panel package at $80,000 and delivery at $17,600. To work out the all-in cost for your lot, add the design and permit scope plus a contractor’s price for the on-site work.

By HRG Prefab · Updated November 23, 2026

Start with the same scope

HRG offers prefab materials and coordinated project services. Materials are produced off-site and assembled on your property. The advertised materials price is not an installed project price. Before comparing two quotes, ask whether both include the same floor area, finishes, delivery and site work.

Use the selected model and finish schedule as your starting point. Then request a written list of included items, allowances, exclusions and who is responsible for each part of the project.

HRG materials and delivery: three planning examples

At the current $100 per square foot materials planning rate, delivery calculated at 22% adds $22 per square foot. Materials plus delivery therefore total $122 per square foot before other project costs.

500 square feet: $50,000 materials + $11,000 delivery = $61,000. 800 square feet: $80,000 + $17,600 = $97,600. 1,200 square feet: $120,000 + $26,400 = $146,400. These are arithmetic examples, not installed quotes or a final materials specification.

Design, approvals, site preparation, foundation, utilities, assembly, selected upgrades and other property requirements must still be accounted for. Confirm package contents, delivery access and unloading responsibilities in writing before ordering.

Build the budget in layers

Building package: the selected prefabricated components and included finishes. Confirm exactly what comes with the model and what is optional.

Design and approvals: property review, drawings, engineering, permit applications and agency fees. Requirements and fees depend on the property and jurisdiction.

Delivery and access: freight, unloading, equipment and access planning. A narrow driveway, overhead lines or a difficult staging area can change the delivery plan.

Site and installation: demolition where needed, grading, foundation, utilities, assembly and finishing by your hired contractor. Ask about utility upgrades and work outside the building footprint.

Contingency: a separate allowance for unresolved site conditions or owner changes. Agree how additional work will be approved before it begins.

Does the ADU kit price include the foundation and utility hookups?

The $97,600 example covers the materials package and delivery for 800 sq. ft. Ask your contractor to show what the foundation costs on your lot, where the water and sewer connect, and whether the electrical service needs work. Add the applicable design, engineering, city fees and on-site assembly to see the budget through move-in.

If one estimate says “site work included,” ask where each utility run starts and ends. Trenching from the house to the ADU, connecting at the street and putting back a driveway are different scopes. Use the same drawing and utility route when you compare bids.

Who unloads the panels if the truck can’t get up my driveway?

The delivery percentage alone does not assign unloading. Before ordering, agree in writing where the truck stops, who receives the panels, who books lifting equipment if needed, and who pays for the move from the truck to the foundation.

Send photos of the approach from the street, the narrowest gate or turn, overhead obstructions and the space available to stage panels. Include the slope and any access limits. HRG and the owner’s licensed contractor can use those details to confirm the delivery plan and identify costs that still need a bid.

What changes the estimate most?

Two properties with the same floor plan can have different project budgets. Slope, soils, foundation requirements, sewer or septic conditions, utility distance and site access all affect scope. Finish choices and a larger floor area can also change the building package.

A planning estimate helps you decide whether to investigate. A contractor bid and signed scope establish the construction work being purchased. Keep those stages distinct when evaluating affordability.

Bring these details to your property review

Share the property address, intended use, preferred floor plan or size, target budget and timing. Include site photos and any survey, utility information or existing plans you already have. Say whether you want materials only or help coordinating the project.

HRG is not the general contractor. The homeowner hires the contractor responsible for construction. The property review helps define responsibilities and the next information needed for a more useful estimate.