1. Review the property and define the scope
Confirm the intended use, preferred size, access, utility information and available budget. Decide whether you need materials only or additional planning and coordination.
Identify the owner, designer, engineering team and hired general contractor responsible for decisions. A clear scope reduces the chance of ordering materials before the site requirements are understood.
2. Complete design and approval work
The plans need to reflect the selected system and the property. Plan-review comments, utility requirements and design revisions can affect this stage.
Ask which decisions must be final before submission and who responds to each reviewing agency. No website timeline replaces the schedule established for your actual project.
3. Coordinate materials and site readiness
Procurement and site work may overlap when the design, approvals and contractor’s plan allow. Confirm finish availability and manufacturing lead times before setting delivery expectations.
Your contractor schedules foundation work, utilities and access preparation. Confirm the site-readiness milestone before dispatching materials.
4. Deliver, assemble and finish
Plan receiving, unloading, weather protection, assembly and any work outside the supplied package. Ask how inspections fit into the sequence before components are covered.
A quick delivery or installation does not mean the home is ready to occupy. Site connections, finishing and required approvals remain part of completion.
5. Complete inspections and handover
Your contractor and relevant authorities handle the construction inspections and final approval applicable to the project. Gather warranties, product information and any remaining completion items.
HRG coordinates the services within its agreement. Request a milestone schedule that names each responsible party and explains how changes will be communicated.