Plan with clarity

Buy a prefab ADU materials package with your own contractor

If you have plans and your own general contractor, you can request a materials-only ADU quote. Send the current drawings, their approval status and the property address so the team can check the panel layout and delivery scope.

By HRG Prefab · Updated November 23, 2026

Can I use the ADU plans I already paid for and just buy the panels?

Start with the latest plan set, including any approved revisions. HRG can review wall lengths, window and door openings and structural details against the proposed panel system. Your design team can identify whether engineering changes or a local review are needed.

Ask for a written takeoff listing the panels, hardware, finishes and freight included. Give the same list to your own contractor to price receiving, assembly and remaining trades. That gives you two scopes you can add together without paying twice for the same item.

Start with the contractor’s scope

Share your contractor’s contact details, property address, floor plan, target budget and current approval status. Your contractor should review the selected system before you commit to procurement.

Separate the materials purchase from the construction agreement. Identify who handles the foundation, utility connections, waterproofing, assembly, inspections and final completion. HRG supplies the agreed package and coordination services; your hired contractor handles construction.

Request a complete package schedule

Ask for the plans and component list, dimensions, structural requirements, finish selections, supplied hardware and assembly information. Confirm what is included for windows, doors, roofing, insulation and interior finishes. Do not assume that the word kit specifies a complete dwelling.

Identify any products your contractor must source separately and resolve substitutions before ordering. Confirm who reviews compatibility between the prefab system and site-built work.

Coordinate approvals before procurement

The team needs to establish the property’s applicable design and approval requirements. Confirm who supplies engineering, who submits documents, who responds to plan-review comments and which fees are excluded.

Tell HRG whether you already have plans or need design and permitting coordination. Existing drawings may require changes to work with the selected system and site conditions.

Make delivery an agreed milestone

Confirm access for the delivery vehicle, unloading equipment, storage protection and who checks quantities or damage on arrival. The foundation and site should be ready for the sequence agreed with the contractor.

Document when responsibility transfers, how missing or damaged materials are reported, and which party coordinates replacements. These details help prevent an inexpensive package from becoming an expensive scheduling problem.

Build a complete budget with your team

Include the package, delivery, professional services, fees, site work, labor, finishes and contingency. Keep the construction bid alongside HRG’s scope so the same item is neither omitted nor purchased twice.

Use the property review to identify the information still needed. Materials-only is a purchasing choice, not a promise that a project can be completed without professional construction work.

Estimate my ADU materials, delivery and site work in Project Builder